If you’re considering a 6 kW rooftop solar system in Pakistan, you want clear numbers, realistic performance estimates, and a practical payback calculation not vague promises. This guide walks you through a professional, data-driven breakdown: component costs, expected energy output, how much money you’ll actually save common problems and solutions, and short- and long-term ROI scenarios tailored to Pakistan’s rapidly changing policy and price environment.

Quick summary

  • Typical installed cost for a good-quality 6 kW rooftop system in Pakistan (grid-tied, no battery) currently sits broadly between PKR 550,000 and PKR 1,000,000, depending on panel brand (Tier-1), inverter type, mounting, and whether batteries or premium components are included.
  • A well-installed 6 kW array will produce roughly 18–28 kWh/day on average (varies by location, orientation, and losses), which is around 6,500–10,000 kWh/year. Use 22–24 kWh/day as a conservative working estimate for many Pakistani cities.
  • Net savings and payback depend heavily on (A) the grid tariff you’re offsetting and (B) the net-metering buyback rules — both of which have changed recently. Using conservative numbers, expect a payback between ~3 to 6 years for homes paying mid to high slab rates; if buyback rates are reduced, payback extends.

What goes into the cost of a 6 kW system?

A realistic price breakdown helps you understand where money goes:

  1. Solar modules (panels) — The largest variable. Modern high-efficiency modules (540–665 W panels) from Tier-1 manufacturers are widely used. Panel unit prices in Pakistan commonly range around PKR 27–34 per watt for quality modules (so modules for 6 kW ≈ PKR 162,000–204,000 at ~30–34 PKR/W). Exact price depends on brand (Longi, Jinko, etc.), wattage and market supply.
  2. Inverter(s) — String inverters or hybrid inverters for grid-tie setups. A reliable 5–8 kW inverter from a good brand will be a significant chunk (PKR ~60,000–200,000 depending on features and brand).
  3. Structure & mounting — Rooftop racking, rails, fasteners, and civil materials: PKR ~30,000–80,000 depending on roof type (concrete vs sheet metal) and complexity.
  4. Electrical BOS (Balance of System) — AC/DC cabling, protections (MCBs, SPD, isolators), combiner boxes, junctions: PKR ~20,000–60,000.
  5. Installation & labor — Electrical and structural installation, testing, commissioning, paperwork (net-metering application): PKR ~30,000–80,000.
  6. Taxes, freight, warranty margins, installer margin — Varies significantly; recent policy shifts (e.g., import taxes) can affect landed price. The government and market changes are actively reshaping final costs.

Putting these together, conservative installed system pricing typically ends up in the PKR 550k–1m band for good quality 6 kW grid-tied systems in 2025. Low-end cheap Chinese components can lower upfront cost but increase long-term risk; Tier-1 panels + reputable inverter + proper warranty push cost upward but reduce lifecycle risk.

How much electricity will a 6 kW system generate? (Realistic calculation)

Solar energy production depends on location (solar insolation), orientation, shading and system losses. Here’s a step-by-step estimate you can reproduce:

  1. Nameplate system size: 6,000 W (6 kW).
  2. Peak sun hours: Pakistan average is roughly 4.5–6.0 peak sun hours depending on city and season. Use 5.0 peak sun hours/day as a conservative national average for calculation.
  3. Derate factor: account for inverter efficiency, temperature, dust, wiring and mismatch — use 0.75–0.85. Conservatively use 0.78.

Daily kWh = 6 kW × 5 hours × 0.78 = 23.4 kWh/day.
Annual kWh ≈ 23.4 × 365 ≈ 8,541 kWh/year.

That aligns with the common Pakistani estimate range of ~18–28 kWh/day (depending on location), so using 22–24 kWh/day is a practical rule-of-thumb for many urban rooftops.

Savings worked examples

Savings depend on the effective cost per unit of electricity you avoid (your bill rate or net-metering credit). Because Pakistan’s tariffs and net-metering buyback rates changed recently and remain politicized, I’ll show three realistic scenarios:

A Conservative grid tariff: PKR 25 per kWh (moderate user)

Annual generation (conservative): 8,000 kWh
Annual saving = 8,000 × 25 = PKR 200,000

If installed cost = PKR 700,000 → payback ~700,000 / 200,000 = 3.5 years (simple payback).

B Higher slab user or commercial rate: PKR 40 per kWh

Annual saving = 8,000 × 40 = PKR 320,000
Same installed cost PKR 700,000 → payback ~700,000 / 320,000 = 2.2 years.

C Effect of reduced net-metering buyback (policy risk)

If feed-in credit is cut (e.g., from PKR ~27/unit earlier toward proposed PKR ~10–12/unit), exported surplus is credited at a much lower rate — meaning you only save the retail rate for self-consumed energy, not necessarily for exported units. For households that self-consume a large share, impact is limited. For households producing large daytime surplus and exporting to grid, the economics worsen. Reports show policymakers proposing cuts to buyback rates and introducing taxes on imports — both materially affect ROI if you were counting on high buyback rates.


Practical example for a typical Pakistani household

  • 6 kW system (installed PKR 700,000)
  • Annual production 8,500 kWh
  • Household self-consumes 60% (5,100 kWh) and exports 40% (3,400 kWh)
  • Retail tariff avoided on self-consumption = PKR 30/kWh
  • Export credit (buyback) = PKR 20/kWh (conservative mid scenario)

Annual cash benefit = (5,100 × 30) + (3,400 × 20)
= 153,000 + 68,000 = PKR 221,000/year

Simple payback ≈ 700,000 / 221,000 ≈ 3.17 years.

This shows why self-consumption (using solar power in daytime for AC, water pumps, EV charging) maximizes value — you avoid paying the retail rate rather than receiving a smaller export credit.

Maintenance, degradation & lifecycle cost

  • Panel degradation is real: modern panels degrade ~0.3–0.7%/year. Expect 80–85% of original output after 25 years for quality modules (manufacturer warranty data). Factor this into long-term yield.
  • Inverter lifetime: 10–15 years typical — budget for a replacement at year 10–15 (cost lower than initial if tech matures).
  • Cleaning & preventive maintenance: PKR ~5k–15k/year depending on accessibility and dust. Dust/sand in many Pakistani cities can reduce production; scheduled cleaning pays off.
  • Warranties: Prefer modules with 10–12 year product and 25 year performance warranty, and inverters with 5–10 year warranty (extendable). These are inexpensive insurance.

Common problems & solutions (Pakistan context)

  • Policy volatility (net-metering rules & import duties) — Keep contracts and ROI conservative and structure your system to maximize self-consumption. Work with installers who handle net-metering paperwork and provide warranty commitments.
  • Roof structural issues — Have a structural engineer sign off for concrete rooftops; use ballasted mounts for weak roofs.
  • Dust & soiling — Implement a quarterly or bi-monthly cleaning schedule during high dust seasons; consider hydrophobic coatings only from trusted vendors.
  • Poor installation — Choose certified installers who provide testing reports, IR thermography scans and commissioning paperwork (NEPRA/ DISCO signage if required).
  • Battery economics — Batteries are still expensive; for pure cost savings most households should start with grid-tied no-battery systems and add batteries later only if backup or energy independence is essential.
6kW Solar System Cost & Savings – Professional Breakdown

How to choose components (buyer’s checklist)

  • Panels: Tier-1 manufacturer, VOC/ISC values, guaranteed Pmax, 25-year performance warranty. Check local availability/pricing (Longi/Jinko common).
  • Inverter: MPPT tracking, anti-islanding certified, cooling design for high ambient temps.
  • Mounting: Corrosion-resistant hardware (galvanized / stainless where salt air present).
  • Installer: Ask for previous local installs, performance data, commissioning docs, and net-metering experience.
  • After-sales: Who handles warranty claims and inverter replacement? Get this in writing.

Financing, incentives & net-metering steps

  • Financing: Many banks and microfinance institutions are offering green financing and consumer solar loans. Compare APR and tenor — a low interest loan can accelerate adoption and still beat electricity inflation.
  • Net-metering: Apply via your local DISCO with NEPRA-approved documents; installers often handle this. Understand the current buyback credit and whether it’s fixed or time-of-use dependent — this affects ROI materially.

Final recommendations

  1. Do an energy audit: measure your daytime load and shift high-consumption tasks to daylight. The more you self-consume, the faster your payback.
  2. Get 3 quotes: one using Tier-1 modules and reliable inverter, one mid-range, one budget — compare LCOE (levelized cost) and warranties, not just sticker price.
  3. Negotiate warranty terms: insist on written performance guarantees and commissioning test reports.
  4. Plan for future expansion: leave roof space and wiring capacity for future battery or EV charger additions.
  5. Monitor performance: insist on an inverter/monitoring portal so you can verify daily kWh and spot underperformance early.

Policy risk

Pakistan’s solar market is high-opportunity but also politically dynamic. In 2025 policymakers debated and in some cases enacted changes to net-metering buyback rates and import taxes that impact economics. Build conservative scenarios into your calculation and prioritize maximizing self-consumption to hedge policy changes.